Summary of XEmacs Issue Tracking System Issues

XEmacs Issue Tracking System xemacs-tracker at xemacs.org
Tue Aug 3 06:35:06 EDT 2010


ACTIVITY SUMMARY (2010-07-27 - 2010-08-03)
XEmacs Issue Tracking System at http://tracker.xemacs.org/XEmacs/its/

To view or respond to any of the issues listed below, click on the issue 
number.  Do NOT respond to this message.


  488 open ( +0) /   234 closed ( +0) /   722 total ( +0)

Open issues with patches:    12

Average duration of open issues: 624 days.
Median duration of open issues: 666 days.

Open Issues Breakdown
              new   163 ( +0)
         deferred     6 ( +0)
          napping     4 ( +0)
         verified    46 ( +0)
         assigned   154 ( +0)
        committed    25 ( +0)
       documented     2 ( +0)
  done/needs work    24 ( +0)



More information about the XEmacs-Beta mailing list